Within the scope of LIFEALFIO project, manufacturing equipment prototype instalation works has been compleated. The performance of prototype equipment was assessed during the production of the test batch. Obtained organoclay samples was tested for a quality control, providing the necessary data to evaluate the organophilization process and the properties of the obtained organomal. Data analysis provided the necessary validation to confirm that the manufacturing process and prototype equipment are capable to provide a product of required quality.
---------